Kinder Morgan Cottonwood Bar Levee Relocation

State(s)

  • LA:
     
  • MS:
     

Project Details

  • Date: 2014 
  • Project Type: Pipeline 
  • Project Distance: 1-10mi 
  • Maximum Pipeline Diameter: 18-24" 

Project Overview

M.G. Dyess, Inc. crews in Transylvania, LA and Onward, MS have finished working on MS River, West and East bank Levee pipeline modifications. Modifications on the West bank of the MS river included raising levee grade, installed approximately 700’ of 24 inch Pipeline and removed existing pipeline. Modifications on the East bank of the MS river included raising levee grade, installing approximately 500’ of 20 inch and 22 inch Pipeline and removal of existing pipelines.