MarkWest Utica EMG, LLC – Seneca to Cadiz Phase 2 South

State(s)

  • OH:
     

Project Details

  • Date: 2014 
  • Project Type: Pipeline 
  • Project Distance: 10-25mi 
  • Maximum Pipeline Diameter: 6-12" 

Project Overview

10" for 15.2 miles.
7 bored road crossings, 2 bored stream crossings, and 27 open cut stream crossings.