Spectra Energy – Kingsport Expansion

State(s)

  • TN:
     

Project Details

  • Date: 2014 
  • Project Type: Pipeline 
  • Project Distance: 10-25mi 
  • Maximum Pipeline Diameter: 18-24" 

Project Overview

6.5 miles of 16", 3.3 miles of 16", and 5.7 miles of 24".
The project contains steep slopes and 2 hard rock HDD's.