Spectra – Access South – Adair Southwest

9.15 miles of 36″ & 4.63 miles of 36″

State(s)

  • OH:
     

Project Details

  • Date: 2018 
  • Project Type: Pipeline 
  • Project Distance: 10-25mi 
  • Maximum Pipeline Diameter: 36-42"