CASE STUDY

Compressor Station
306 Reversal

Malvern Arkansas, 2019

OVERVIEW

Location

Malvern, AR

Year

2019

  • Modification of four existing pig traps for bi‐directional ILI pig runs
  • Installation of four (4) air to gas high pressure process gas coolers, three (3) fans each
  • Installation of three (3) coalescing filter separators
  • Removal of three (3) mainline existing filter separators
  • Installation of new skid mounted MCC building and associated electrical power supply
  • Installation of double wall, atmospheric condensate storage tank and all associated accessories
  • Modifications/tie‐ins to existing ESD and Power Gas systems, including piping/valve and electrical installation
  • Replacement of existing pneumatic Robert Shaw engine control panels on eight (8) units with new electronic Allen‐Bradley panels and one JS‐8 Generator control panel
  • Upgrade existing Fire and Gas System
  • Replacement of Station Control Plan panel with Allen‐Bradley Contol Logix system
  • Installation of Remote I/O panels
  • Modification of existing Shafer actuators on existing valves